home libri books Fumetti ebook dvd top ten sconti 0 Carrello


Torna Indietro

o'brien james j. - construction inspection handbook

Construction Inspection Handbook Quality Assurance/Quality Control




Disponibilità: Normalmente disponibile in 15 giorni
A causa di problematiche nell'approvvigionamento legate alla Brexit sono possibili ritardi nelle consegne.


PREZZO
162,98 €
NICEPRICE
154,83 €
SCONTO
5%



Questo prodotto usufruisce delle SPEDIZIONI GRATIS
selezionando l'opzione Corriere Veloce in fase di ordine.


Pagabile anche con Carta della cultura giovani e del merito, 18App Bonus Cultura e Carta del Docente


Facebook Twitter Aggiungi commento


Spese Gratis

Dettagli

Genere:Libro
Lingua: Inglese
Editore:

Springer

Pubblicazione: 09/2012
Edizione: 3rd ed. 1989. Softcover reprint of the original 3r





Trama

The inspection team must become familiar with the plans and the specifica­ tions; they form the basis upon which the QC inspection is made. The in­ spector must realize that errors and omissions will be discovered, and will have to be duly reported to management. Wherever an error or omission is substantial, it is appropriate to review it with the designer first to ensure that the error noted is valid. The QC inspection team is on the job to be objective, and to enforce the contract as written. When the contract does not suffice to cover the work conditions, then the Inspector should request the opportunity to prepare an appropriate clarification or change order to the contract. The question of whether a change order is to result in a credit to the owner or to the contractor is a matter of interpretation of the plans and specifications. The Inspector should exercise great care to avoid casual commitment or agreement with change items, and should first research a change or requirement in the plans and specifications to determine that it is not included in the contractual scope-either partially or completely. Next, the inspector should collaborate with the management team, receiving their agreement before making any commitments or carrying on any conclusive discussions with the contractor. From that point on, standard change order procedures, approvals, and doc­ umentation should be followed.




Sommario

A. Quality Assurance.- A-1 The Need for QA/QC.- A-2 Quality Assurance (QA) Plans.- A-3 Codes and Standards.- A-4 Contract Documents.- A-5 Legal Aspects.- B. Quality Control.- B-1 Quality Control Inspection Team.- B-2 QC Field Testing.- B-3 Temporary Construction.- B-4 Field Administration.- B-5 Safety.- C. Project Characteristics.- 2 Sitework.- 3 Concrete.- 4 Masonry.- 5 Metals.- 6 Wood and Plastics.- 7 Thermal and Moisture Protection.- 8 Doors and Windows.- 9 Finishes.- 10 Specialties.- 11 Equipment.- 12 Furnishings.- 13 Special Construction.- 14 Conveying Systems.- 15 Mechanical.- 16 Electrical.- D. Documentation.- Appendix A ASTM Standards.- Appendix B ANSI Standards.- Appendix C Organizations and Associations.- Appendix D Quality Assurance Plan.- Appendix E Project Management Procedures.










Altre Informazioni

ISBN:

9781475711936

Condizione: Nuovo
Dimensioni: 210 x 148 mm Ø 1008 gr
Formato: Brossura
Illustration Notes:X, 773 p.
Pagine Arabe: 773
Pagine Romane: x


Dicono di noi