home libri books Fumetti ebook dvd top ten sconti 0 Carrello


Torna Indietro

vanhoucke mario - project management with dynamic scheduling

Project Management with Dynamic Scheduling Baseline Scheduling, Risk Analysis and Project Control




Disponibilità: Normalmente disponibile in 15 giorni


PREZZO
183,98 €
NICEPRICE
174,78 €
SCONTO
5%



Questo prodotto usufruisce delle SPEDIZIONI GRATIS
selezionando l'opzione Corriere Veloce in fase di ordine.


Pagabile anche con Carta della cultura giovani e del merito, 18App Bonus Cultura e Carta del Docente


Facebook Twitter Aggiungi commento


Spese Gratis

Dettagli

Genere:Libro
Lingua: Inglese
Editore:

Springer

Pubblicazione: 12/2013
Edizione: 2nd ed. 2013





Trama

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on.

In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".





Sommario

Preface.- I Scheduling without resources.- II Scheduling with resources.- III Project control.- IV Scheduling with software.- V Conclusions.- Index.











Altre Informazioni

ISBN:

9783642404375

Condizione: Nuovo
Dimensioni: 235 x 155 mm Ø 6269 gr
Formato: Copertina rigida
Illustration Notes:XVIII, 318 p. 123 illus.
Pagine Arabe: 318
Pagine Romane: xviii


Dicono di noi